Problem T410 Your answer is partially correct Try again Gera
Solution
since the annual budget was set to produce 1,000,000 shirts using 250,000 direct labour hour
i.e. production of 1 shirt requires = 250,000/1,000,000 = 0.25 direct labour hour
and recovery rate set to $6 per direct labour hour i.e. 1 shirt costs = 0.25*6=$1.5 fixed overhead
1) so total budgeted fixed overhead cost = budgeted output*recovery rate = 1,000,000*1.5=$1,500,000
2) monthly fixed overhead budgeted amount = annualamount/12 = $1,500,000/12= $125,000
the amount does not depend upon the volume produced since its fixed not variable to quantity produced. Its us who allocates these fixed amount to per unit produced known as revoery rate.
3) fixed overhead voulme variance = Actual Output x Fixed overhead recovery rate -Budgeted Output x Fixed overhead recovery rate
volume variance between jan to aug,
jan to aug= 8 months
budgeted output = 1000000/12= 83333.33 shirts per month or
Budgeted Output x Fixed overhead recovery rate = 83333.33*1.5= $125000 per month(equals to ehat we calculated in Q2)
volume variance between jan to aug, = 8 months * (80000*1.5- 125000) = -40000 (unfavourable)
volume variance between sep to dec, = 4 months * (90000*1.5- 125000) = +40000 (unfavourable)
volume variance between jan to dec, = volume variance between jan to aug,+ volume variance between sep to dec,
volume variance between jan to dec, = -40000 + 40000 = $0
basically volume variance refers to the difference in cost due to change in volume , since annual actual voulume = 80000*8+90000*4 = 1,000,000 shirts matches the annual budgeted shirts , hence there is no difference annual wise,
bu monthly section wise its different becoz of change in quantum monthly wise