5 Herald Corporation constructed a building at a cost of 100
5. Herald Corporation constructed a building at a cost of $100,000. A local contractor had submitted a bid to construct it for $90,000.
a. At what amount should the building be recorded?
b. Should revenue be recorded for the savings between the cost of $90,000 and the bid of $100,000?
Solution
a. The building should be recorded at its cost of $100,000.
b. No. The building should be recorded at its actual cost of construction which is $100,000. No revenue should be recorded as it is not actual revenue earned.