3 How long should it take for a 613G series Il Scraper to se
3. How long should it take for a 613G series Il Scraper to self-load in normal conditions?
Solution
Hello,
613G is more productive than its predecessor 613C-II and can load material as much as 13 percent faster.
Self Load time of 613C-II = 0.9 minutes
So, Self Load time of 613G = 0.9/1.13 ( Since 613G can load material as much as 13 percent faster.)
= 0.796 minutes = 0.8 min. Approximately
