Problem2 You are commissioned to evaluate a Rapid Infiltrati
Solution
Average flowrate in the facility= 0.044 MGD = 0.044 X 1000000 X 0.00378541 cubic metres per day = 166.55804 cu.m per day
Average infiltration rate = 12 cms per year = 12/365 = 0.033 cms per day or 0.00033 mtr per day (considering 365 days in a year)
Assuming a minimum area of \'A\' square metres of the infiltration basin with 1 mtr depth and consideing the evaporation rate of 190 cms/yr or 190/365 cms/day or 0.0052 mtrs per day;
166.558 - 0.0052 X A = 0.00033 X A
or, 166.558 = 0.00553 X A
or, A = 30118.99 square metres
Assuming the basin is rectangular, the area can be considered as 210 X 150 square metres whereas considering the circular shape, the basin will be of radius 100 metres. This will be the minimum area.
Now, Assuming a minimum area of \'A\' square metres of the infiltration basin with 1 mtr depth and considering the evaporation rate of 228 cms/yr or 228/365 cms/day or 0.00625 mtrs per day;
166.558 - 0.00625 X A = 0.00033 X A
or, 166.558 = 0.00658 X A
or, A = 25312.77 square metres
Assuming the basin is rectangular, the area can be considered as 200 X 130 square metres whereas considering the circular shape, the basin will be of radius 90 metres. This will be the minimum area.
When RIB is 500 ft x 728 ft or 152.4 mtrs x 221.9 mtrs and evaporation rate = 190 cms/yr
RIB Area = 33817.56 square metres
Infilration rate x 33817.56 = 166.558 - 0.0052 x 33817.56
Infiltration rate = 0.000274 mtrs per day 0.0274 cms per day or 10.001 cms per year
When RIB is 500 ft x 600 ft or 152.4 mtrs x 182.88 mtrs and evaporation rate = 228 cms/yr
RIB Area = 27870.912 square metres
Infilration rate x 27870.912 = 166.558 - 0.00625 x 27870.912
Infiltration rate = 0.0002739 mtrs per day 0.02739 cms per day or 9.997 cms per year
