Fill in the following master schedule with the Projected Ava
Solution
while preparing the master schedule,we should take care of many parameters.like forecasting time period ,no.of .orders,planning time period ,objects on hand,demand.
the major concern is about the demand.production should be done according to the demand.if the demand is high then production should increase.the demand should be forecasted carefully.forecasting plays a major role in success of the organisation .wrong forecasting leads to severe losses.
b) as the demand is less there is no problem of crisis.on hand availability is more than the demand
c)on hannd availabiliy is less .so there is a need to take care of production
d)master production scheudule should be remodified from that specific period or else production should be handled by preparing another MPS from that specific period
e)production should be done according to the lot size and on hand availability of previous period and current forecasting have to be done .if 50 is added then there is a change in the lot size and the successive readings will differ and need to fore cast again