102 Examine the network schedule with its activities their d

10.2 Examine the network schedule with its activities, their dura- tions, and initial cost plus extra cost for acceleration in the table. Draw its network diagram, determine the critical path, perform a time-cost trade-off analysis to minimize the total project duration and accelerated cost, and record your steps. AHS - 3 wk 3 wk 2 wk 2 wk 3 wk

Solution

Critical path means lonhest path of the activity.

Here the critical is...

A-B-C-G-H

 10.2 Examine the network schedule with its activities, their dura- tions, and initial cost plus extra cost for acceleration in the table. Draw its network diag

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site