GE 496Spring 2018Engels 1 pt The architect works with the de

GE 496-Spring 2018-Engels (1 pt) The architect works with the design team to protect the best interests of the a. Contractor b. Plan checker c. Building inspector d. Owner (2 pts) The design and construction \' which TWO below: referees\' that ensure the safety of the general public are a. Plan checker b. Architect c. Contractor d. Design team e. Building inspector f. Owner d pt Alimemberc on the desien team need t tke ito consideration a. Seismic forces b. Air movement c. Solar form d. Pedestrian circulation (6 pts) Th e consultants that most typically make up the design team are (Pick SIX): a. Civil b. Landscape c. Structural d. Interiors e. Irrigation f. Mechanical 8. Electrical h. Plumbing i. Fire suppression j. Acoustical (2 pts) The top TWO concerns for the contractor are: a. Schedule b. Inspections c. Submittals d. RFIs e. Subcontractor trades f. Budget (3 pts) The top three goals of integrated design are and integration. a. Physical b. Acoustical c. Visual d. Mechanical e. Performance f. Energy

Solution

(1) Answer:- (d) owner

(2)Answer:- (a) Plan checker , (e) building inspector

(3) Answer:- (a) Seismic forces

(4) Answer:- (a) Civil , (b) Structural , (d) Interiors , (e) Irrigation , (f) Mechanical, (g) Electrical

(5) Answer:- (e ) Subcontractor trades , (f) Budget

(6) Answer:- physical , energy , performance

 GE 496-Spring 2018-Engels (1 pt) The architect works with the design team to protect the best interests of the a. Contractor b. Plan checker c. Building inspec

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site