M49 Assigning Costs Using Activity Rates LO 44 Cost 69825 10
M4-9 Assigning Costs Using Activity Rates [LO 4-4] Cost 69,825 108,800
Solution
Cost pools Cost Activity rates Machining 366600 28.2 =366600/13000 Setup 69825 199.5 =69825/350 Quality control 108800 136 =108800/800 Cost pools Allocated Overhead Machining 70500 =2500*28.2 Setup 19950 =100*199.5 Quality control 40800 =300*136 Total overhead 131250![M4-9 Assigning Costs Using Activity Rates [LO 4-4] Cost 69,825 108,800 Solution Cost pools Cost Activity rates Machining 366600 28.2 =366600/13000 Setup 69825 M4-9 Assigning Costs Using Activity Rates [LO 4-4] Cost 69,825 108,800 Solution Cost pools Cost Activity rates Machining 366600 28.2 =366600/13000 Setup 69825](/WebImages/22/m49-assigning-costs-using-activity-rates-lo-44-cost-69825-10-1051177-1761547582-0.webp)