QUESTION 5 (40 marks): Complete all missing items in the tender summary form on the next page, which is for th administrative building. The footprint dimensions of the building are shown below. Spread all add in proportion to the direct costs of eligible items. e construction of an itional costs The following apply: Indirect costs: (the project is expected to last 6 months; there is no minimum rental period): Rental of site trailers: Vehicles: Utilities Additional indirect costs: $600/month $450/month/vehicle, need 15 vehicles $1200/month 3.5% of total direct costs Risk and opportunity allowance: Contingency (risk/opportunity allowance) Markup: 10% of total direct costs $1,000, 000 Slab: Assume 1.3 m2 of concrete is required per m2 of surface area of slab (inclusive of . Cost of concrete is $200/m3 .Labour productivity: waste) . 0.75 m2/mhr 2.25 m3/mhr formwork place concrete Labour wage rate (including taxes and fringe benefits): $50/mhr for formwork and concrete

Solution

Answer:

The missing items in tender summary as below:

1. Grade of Concrete & Reinforcement Co-efficient per sqft

2. Soil Test details

3. Standard Reinforcement details

4. List of assumptions & omissions

5. Site investigation report

6. Factor of safety considered

7. Final offer rate / amount.

Thanks.