37 Lumber Cutter The lengths of lumber a machine cuts are no
Solution
a)
We first get the z score for the critical value. As z = (x - u) / s, then as
x = critical value = 96.25
u = mean = 96
s = standard deviation = 0.5
Thus,
z = (x - u) / s = 0.5
Thus, using a table/technology, the right tailed area of this is
P(z > 0.5 ) = 0.308537539 [ANSWER]
******************
b)
We first get the z score for the critical value. As z = (x - u) sqrt(n) / s, then as
x = critical value = 96.25
u = mean = 96
n = sample size = 40
s = standard deviation = 0.5
Thus,
z = (x - u) * sqrt(n) / s = 3.16227766
Thus, using a table/technology, the right tailed area of this is
P(z > 3.16227766 ) = 0.000782701 [ANSWER]
*******************
c)
Part a has a greater probability [ANSWER], because part a has a greater standard deviation than part b.
