12. A process has been studied and the following times have been collected. Number Made N Time to make in minutes 28 2 24 4 18 21 16 14 10 Using the doubles approach, determine the learning curve rate and calculate the projected time for the 10th unit. a. b. Using regressio n, determine the learning curve rate and calculate the time for the 10th unit.

Solution

The learning curve rate is 75.93

The projected time for the 10th unit is

b.

Y=29.214-2.547x

=29.214-2.547*10 =3.744

N T Cumulative of N Cumulative of T Cumulative average T/N learning rate
1 28 1 28 28
2 24 3 52 17.33333333 61.90
3 21 6 73 12.16666667 70.19
4 18 10 91 9.1 74.79
5 16 15 107 7.133333333 78.39
6 14 21 121 5.761904762 80.77
7 11 28 132 4.714285714 81.82
8 10 36 142 3.944444444 83.67
75.93