Shde Show Review View net location and might be unsafe. Click for more details. Enable Editing . Activity-based Costing is one of the cost accounting strategies. Discuss the ABC system and the main differences betwen the traditional costing and the ABC systems. . In ABC we allocate the overhead to multiple activity cost pools and it assigns them to products or services. ABC more accurate, complex and expensive ABC doesn\'t assign all manufacturing costs ABC uses multiple cost pools Traditional usually rely on the volume measures such as direct labor hours and/or machine hours to allocate all overhead costs to products 91961 F6 F7 FB F9 NS F5 SYSR BACK SP AC POUP 9

Solution

SOLUTION A:- under activity based costing a firm first identifies its activities and then allocates indirects costs associated with such products.

SOLUTION B:-1. select the dependent  variable{Y} dependent variable or response variable for which cost is to predicted.

2.select the cost drivers/ independent variables :it means any factor that causes any change in the total cost with the change in the those factors.

3. data need to be collected showcasing the relationships between the dependent and independent variables.

4.after that data is plotted on the graph

5.that relatoinships is chosen that predicts the best dependent variables.

6.reliability of the cost function is checked.

SOLUTION C:-major financial statements includes the following:-

1.balance sheet:it shows the postion of assets and liabilities as at the end of the financial year.

2. income statement:it shows the position of profitability for a defined period.

3.cash flow statement:it shows the outflow/inflow of cash in operating ,financing and investing activities of a firm .

4. statement of shareholders equity:this statement shows the changes in shareholder equity account.

BASIS ACTIVITY BASED COSTING TRADITIONAL COSTING
process it considers important factors before assigning cost to different products therefore it is a complicated and time consuming process. comparatively much easy because the main focus is to assign the average overheads rate to the products.
USED WHEN when the organisation demands greater accuracy because calculations are more precise and accurate. limited availability of time , accuracy doesnt get effected due to production.
how cost is assigned based on the products usage of the activities. using a pre determined overhead rate.
 can u rewrite the answers in different words Shde Show Review View net location and might be unsafe. Click for more details. Enable Editing . Activity-based Co