The length of human pregnancies from conception to birth var
The length of human pregnancies from conception to birth varies according to a distribution that is approximately Normal with mean 263 days and standard deviation 16 days.
(a) What proportion of pregnancies last less than 270 days (about 9 months)?
(b) What proportion of pregnancies last between 240 and 270 days (roughly between 8 months and 9 months)?
(c) How long do the longest 20% of pregnancies last? (Please use 2 decimal places.)
The quartiles of any distribution are the values with cumulative proportions 0.25 and 0.75.
(d) What are the quartiles of the standard Normal distribution? (Use 2 decimal places.)
Q1=
Q3=
(e) What are the quartiles of the distribution of lengths of human pregnancies? Please use 2 decimal places.
Q1=
Q3=
Solution
a)
We first get the z score for the critical value. As z = (x - u) / s, then as
x = critical value = 270
u = mean = 263
s = standard deviation = 16
Thus,
z = (x - u) / s = 0.4375
Thus, using a table/technology, the left tailed area of this is
P(z < 0.4375 ) = 0.669125612 [answer]
*****************
b)
We first get the z score for the two values. As z = (x - u) / s, then as
x1 = lower bound = 240
x2 = upper bound = 270
u = mean = 263
s = standard deviation = 16
Thus, the two z scores are
z1 = lower z score = (x1 - u)/s = -1.4375
z2 = upper z score = (x2 - u) / s = 0.4375
Using table/technology, the left tailed areas between these z scores is
P(z < z1) = 0.075287986
P(z < z2) = 0.669125612
Thus, the area between them, by subtracting these areas, is
P(z1 < z < z2) = 0.593837626 [answer]
**************************
c)
First, we get the z score from the given left tailed area. As
Left tailed area = 0.8
Then, using table or technology,
z = 0.841621234
As x = u + z * s
where
u = mean = 263
z = the critical z score = 0.841621234
s = standard deviation = 16
Then
x = critical value = 276.4659397 [answer]
*****************************
d)
The quartiles of the z distrbution are, using table or technology, using left tailed areas of 0.25 and 0.75, repspectively,
z(Q1) = -0.67448975 [answer]
z(Q3) = 0.67448975 [answer]
*****************************
e)
First, we get the z score from the given left tailed area. As
Left tailed area = 0.25
Then, using table or technology,
z = -0.67448975
As x = u + z * s,
where
u = mean = 263
z = the critical z score = -0.67448975
s = standard deviation = 16
Then
x = critical value = 252.208164 [ANSWER, Q1]
First, we get the z score from the given left tailed area. As
Left tailed area = 0.75
Then, using table or technology,
z = 0.67448975
As x = u + z * s,
where
u = mean = 263
z = the critical z score = 0.67448975
s = standard deviation = 16
Then
x = critical value = 273.791836 [answer, Q2]


