A transportation engineering study requires that you determi
A transportation engineering study requires that you determine the number of cars that pass through an intersection traveling during morning rush hour. You stand at the side of the road and count the number of cars that pass every 4 minutes at several times as tabulated below. Use the best numerical methods to determine The total number of cars that pass between 7:30 am and 9:15 am The rate of cars going through the intersection per minute
Solution
(a) Number of cars between 7.30 - 7.45 : In 4 min: 20 cars, So, In 15 min: 75 Cars
Number of cars between 7.45 - 8.00 - In 4 min: 30 cars. So, In 15 min: 112.5 Cars
Number of cars between 8.00 - 8.15 : In 4 min: 26 cars. So, In 15 min: 97.5 Cars
Number of cars between 8.15 - 8.45 : In 4 min: 20 cars. So, In 30 min: 150 Cars
Number of cars between 8.45 - 9.15: In 4 min: 20 cars. So, in 30 min: 150 cars
Total cars 585 cars
Total cars: 585
Total time: 15 + 15 + 15 + 30 + 30 = 105
Rate of cars = 585/105 = 5.5714
