5 Exercise 25 Computing Total Job Costs and Unit Product Cos

5 Exercise 2-5 Computing Total Job Costs and Unit Product Costs Using Multiple Predetermined Overhead Rates [LO2-4 166 and F The predetermined overhead rates in and 120% of direct m direct labor wage rate is $20.00 per hour. The following information pertains to Job 700 Direct labor s 100 trences1 What is the total manufacturing cost assigned to Job 700? 2. t Job 700 consists of 20 units, what is the unit product cost for this Job? (Round your answer to 2 decimal places.)

Solution

SOLUTION:-

total manufacturing cost=727+221=948

2.948/20=$47.4 per unit

finishing fabrication
materials=430 materials=55
labor=180(9*20) labor=100(5*20)
overheads=13*9=117 overheads=55*120%=66
total=727 toatl=221
 5 Exercise 2-5 Computing Total Job Costs and Unit Product Costs Using Multiple Predetermined Overhead Rates [LO2-4 166 and F The predetermined overhead rates i

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site