Microsoft Office Home Mal Michael i Code tps d 3 Homework S
× Microsoft Office Home Mal Michael i. Code! tps d 3 Homework Saved Help Save &Exit; Check my w Luthan Company uses a plartwide predetermined overhead rate of $22.10 per direct labor-hour. This predetermined rate was based on a cost formula that estimated $265,200 of total manufactuning overheed cost for an estimated activity level of 12,000 direct labor hours The company incurred actual total manufacturing overhead cost of $267,000 and 12.200 total direct labor-hours during the period Required Detesmne the amount of manufacturing overhead cost than wouid have been applied to atjous dhinng the period 0
Solution
Manufacturing overhead applied = ( Predetermined overhead rate ) * Actual activity
Manufacturing overhead applied = ( $ 22.10 ) * 12,200
Manufacturing overhead applied = $ 269,620
