Electric power is to be generated by installing a hydraulic
Electric power is to be generated by installing a hydraulic turbine-generator at a site 115m below the free surface of a large reservoir. If water falling from the surface this height is flowing at a rate of 1350 kg/s determine the power generation potetial.
Solution
power = energy / time
= m g h / time
= ( 1350 kg /s ) ( 9.8 m/s2 ) (115 m )
=1.52x106 J/s
