Environmental engineering Q1 A wastewater treatment plant a
Environmental engineering
Q1:. A wastewater treatment plant a clarifier treating 0.04 m\'/s of water. The 5 m wide, 25 m long and 3.5 m deep. Determine: a) b) e) The detention time Surface Overflow Rate Weir loading rate assuming the weir length is 2.5 times the clarifier width. Q2:. An aerobis oxidation nond has a votSolution
Amount of water, clarifier treats = 0.04 m3/s
Width of the clarifier = 5m
Length of the clarifier = 25m
Depth of the clarifier = 3.5m
a) Detention time (T) = Volume the clarifier/Discharge
=437.5/0.04
=10937.5 sec
=10937.5/3600
= 3.04 hrs
b) Surface over flow rate (SOR) = Discharge/ Cross sectional area of clarifier
= 0.04/125
= 3.2 * 10-4 m3/m2/s
Weir length = 2.5* clarifier width =12.5 m
c) Weir loading rate = Discharge/ weir length
=0.04/12.5
=3.2*10-3 m3/m/s