If you construct a NEW HMA pavement treated with a seal coat

If you construct a NEW HMA pavement treated with a seal coat (i.e., surface treatment). Put the following steps in orden Spread a uniform size materials on the asphalt cement Tack coating Subbase construction Prime coating

Solution

1.sub base construction

2.track coating

3.prime coating

4.spread a uniform size materials on the asphalt cement

 If you construct a NEW HMA pavement treated with a seal coat (i.e., surface treatment). Put the following steps in orden Spread a uniform size materials on the