Joe digs a ditch in 32 hours Joe working with George can did

Joe digs a ditch in 3.2 hours.
Joe working with George can did the same length ditch in 2.7 hours.
How long would it take George to dig the ditch by himself ?

Solution

Joe digs a ditch in 3.2 hours...so in 1 hour he digs 1/3.2 ditch=10/32=5/16
let george alone take x hrs to dig the ditch...so in 1 hour he digs 1/x ditch
so in 1 hour joe and george together dig 5/16+1/x ditch =(5x+16)/16x
so they take 16x/(5x+16) hrs to dig the ditch together
but this given as 2.7 hours
so 16x/(5x+16)=2.7
cross multiplying we get
16x=2.7(5x+16)=13.5x+43.2
16x-13.5x=43.2
2.5x=43.2
x=43.2/2.5=432/25=17.28 hours
so george alone takes 17.28 hrs to dig the ditch

Joe digs a ditch in 3.2 hours. Joe working with George can did the same length ditch in 2.7 hours. How long would it take George to dig the ditch by himself ?So

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site