A projects base case or most likely NPV is 50000 and assume
A project\'s base case or most likely NPV is $50,000, and assume its probability of occurence is 60%. Assume the best case scenario NPV is 50% higher than the base case and assume the worst scenario NPV is 30% lower than the base case. Both the best case scenario and the worst case scenario have a 20% probability of occurrence. Find the project\'s coefficient of variation.
Please show work in its simplest form.
Solution

