suppose that one worker can shovel snow from a storefront si
suppose that one worker can shovel snow from a storefront sidewalk in 50 minutes and another worker can shovel it in 30 minutes. How long will it take if they worked together?
Solution
#1 does 1/50 of the job per minute.
 #2 does 1/30
 Together, 1/50 + 1/30 = 8/150 per minute
 --> 150/8 minutes to do the job
 = 75/4 minutes
 --------------
 Use the shortcut, product/sum
 50*30/(50+30) = 1500/80
 = 75/4 minutes

