A machine tool is used to machine parts in batches In one ba


A machine tool is used to machine parts in batches. In one batch of interest, the starting piece is a casting that costs = $5.00 each. Batch quantity = 40. The actual machining time in the operation = 6.86 min. Time to load and unload each workpiece = 2.0 min. Cost of the cutting tool = $3.00, and each tool must be changed every 10 pieces. Tool change time = 1.5 min. Setup time for the batch = 1.75 hr. Hourly wage rate of the operator = $16.00/hr, and the applicable labor overhead rate = 50%. Hourly equipment cost rate = $22.00/hr, which includes overhead. Assume availability = 100% and scrap rate = 0. Determine: The cycle time for the piece Average hourly production rate when setup time is figured in; and Cost per piece.

Solution

Given:- Cc = Cost of casting= $5.00

Ct = Initial cost of the tool = $3.00; p= No. of parts produced per batch = 40

Tm= Machining Time = 6.86 min; tl= time to load and unload = 2.0min;  

pg= No of pieces produced between tool changing = 10; tc = Tool changing time = 1.5min

to= Set up time for a batch = 1.75 hr; CL= Manpower cost = $16.00; Cm= Machine tool operating cost = $22.00

R= Labor overhead rate = 50%

a) Cycle time for the peice = Tm + tl + Set up time per peice

Set up time per piece = (1.75x60/40) =2.625 min

Hence Cycle time for the peice = 11.485 min

b) Average hourly production rate = 60/11.485 = 5.224 pieces /hr

c) Co = overall overhead cost =  CL + Cm(1+R) = $49.00/60= $0.8167/min

Cost of all overheads per piece = C1 = Co(tl+to/p) = $3.77

Total cost of the tool C2 = Cost of tool replacement +Cost of the tool

C2 = ((C0xtc)+ Ct ) / pg = $0.422

Machining Cost = C3 = CoTm = $5.602

therefore total cost per piece is

C= Cc+C1+C2+C3 = $14.794

 A machine tool is used to machine parts in batches. In one batch of interest, the starting piece is a casting that costs = $5.00 each. Batch quantity = 40. The