A machine tool is used to machine parts in batches In one ba
Solution
Given:- Cc = Cost of casting= $5.00
Ct = Initial cost of the tool = $3.00; p= No. of parts produced per batch = 40
Tm= Machining Time = 6.86 min; tl= time to load and unload = 2.0min;
pg= No of pieces produced between tool changing = 10; tc = Tool changing time = 1.5min
to= Set up time for a batch = 1.75 hr; CL= Manpower cost = $16.00; Cm= Machine tool operating cost = $22.00
R= Labor overhead rate = 50%
a) Cycle time for the peice = Tm + tl + Set up time per peice
Set up time per piece = (1.75x60/40) =2.625 min
Hence Cycle time for the peice = 11.485 min
b) Average hourly production rate = 60/11.485 = 5.224 pieces /hr
c) Co = overall overhead cost = CL + Cm(1+R) = $49.00/60= $0.8167/min
Cost of all overheads per piece = C1 = Co(tl+to/p) = $3.77
Total cost of the tool C2 = Cost of tool replacement +Cost of the tool
C2 = ((C0xtc)+ Ct ) / pg = $0.422
Machining Cost = C3 = CoTm = $5.602
therefore total cost per piece is
C= Cc+C1+C2+C3 = $14.794