M43 identlying Cost Drivers 110 QSearch E414 Assigning Co
     M4-3 identlying Cost Drivers | +  110% * Q,Search E4-14 Assigning Costs Using Traditional System, ABC System [Lo 4-1,4-3,44,45 Julio produces two types of calculator, standard and deluxe. The move to activity-based costing In preparing for the possible switch, Julio has identified two cost pools: materials handing and setup. The collected dlata follow: x company is currently using a traditiortal costing system with machine hours as the cost driver but is considening a Number of machine hours Number of material moves Number of setups 26,500 625 85 31,500 925 575 Total estimated overhead costs are $382,020, of which $186,000 is assigned to the material handing cost pool and $196.020 is assigned to the setup cost pool Required: 1. Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places.) Standard Model 2. Calculate the overhead assigned to each product using ABC Delxe Model De End ns Esc     
 
  
  Solution
1)Total number of machine hours :26500+31500=58000
Predetermined overhead :Estimated overhead /estimated machine hours
= 382020 / 58000
= $ 6.5866 per MH
Standard :26500*6.5866 = $ 174545
deluxe :31500*6.5866 = $ 207477
2)
| Standard | deluxe | ||
| Material handling | 186000/(625+925)= 120 | 625*120= 75000 | 925*120=111000 | 
| set up | 196020/(85+575)=297 | 85*297=25245 | 575*297=170775 | 
| Total allocation | 100245 | 281775 | |

