The time it takes to bake a Betty Crocker Supermoist Fudge Cake is normally distributed with a mean of 38 minutes and a variance of 46 minutes^2. Let baking time, in minutes, be represented by random variable X.
P(x1 < X < 41) = 0.0930. Find x1. (Remember the label.)
Solution
For the left tailed area of x = 41:
We first get the z score for the critical value. As z = (x - u) / s, then as          
           
 x = critical value =    41      
 u = mean =    38      
           
 s = standard deviation =    6.782329983      
           
 Thus,          
           
 z = (x - u) / s =    0.442325868      
           
 Thus, using a table/technology, the left tailed area of this is          
           
 P(z <   0.442325868   ) =    0.670873293
Thus, the left tailed area of x1 is 0.670873293 - 0.0930 = 0.577873293.
********************************
For x1:
First, we get the z score from the given left tailed area. As          
           
 Left tailed area =    0.577873293      
           
 Then, using table or technology,          
           
 z =    0.196455814      
           
 As x = u + z * s,          
           
 where          
           
 u = mean =    38      
 z = the critical z score =    0.196455814      
 s = standard deviation =    6.782329983      
           
 Then          
           
 x1 = critical value =    39.33242816 MINUTES [ANSWER]  