A new machine is set or calibrated to fill tubes of toothpas

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then, once the machine is running, a sample of 3 tubes is taken every three hours and weighed with the following results:


What is the value of the upper control factor of the range?

2.575

1.847

0.873

2.619

  WEIGHT OF TOOTHPASTE
  TIME 7 am 6.70 6.69 8.78
10 am 6.72 6.73 6.72
1 pm 6.67 6.69 6.68
4 pm 6.74 6.75 6.73
7 pm 6.76 6.74 6.76

Solution

A new machine is set or calibrated to fill tubes of toothpaste at precisely 6.75 ounces. Then, once the machine is running, a sample of 3 tubes is taken every t

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site