One 2018 52 Activitybased costing Output units 500 2000 1000

One 2018 5.2 Activity-based costing Output (units) 500 2,000 1,000 A 10 25 ks 1200 $5 00

Solution

First let us find the total machine setups:
= output/UNits per batch
for A:=10000/500=20
for B:=20000/2000=10
for C: 20000/1000=20
Scheduling costs per batch =total cots/no of batches
=50000/(20+10+20)=1000
for product A the cost per unit=total cost/no of units per batch
=1000/500=2

 One 2018 5.2 Activity-based costing Output (units) 500 2,000 1,000 A 10 25 ks 1200 $5 00 SolutionFirst let us find the total machine setups: = output/UNits per