My Blackboard Content BlaxFile a Phone Insurance Claim x As
) My Blackboard Content -BlaxFile a Phone Insurance Claim x Asurion Bootcan O ezto.mheducation.com/hm.tpx Bookmarks Gable Company uses three activity cost pools. Each pool has a cost driver. Information for Gable Company follows Estimated Cost Total Cost of Pool $260,000 57,000 77,000 Cost Driver Activity Cost Pools Machining Designing costs Setup costs Number of machine hours Number of design hours Number of batches 75,700 7,000 430 Required 1. Compute the activity rate for each activity, (Round your answers to 2 decimal places.) Activity Activity Rate per Machine Hour per Design Hour per Batchh Design Costs 2. Classity each activity as facility product, batch, or unit level. Unit Level Design Customer or Product Level 888 a 2 3 4 5 6

Solution
Calculation of Activity rate
Activity Rate= Cost Pool/ Estimated cost driver
Activity
(a)
Cost Pool(in $)
(b)
Cost Driver
( c)
Estimated cost driver
(d)
Activity rate
(e)= (b)/ (d)
Machining
260000
Number of machine hours
75700 hours
3.43 per machine hour
Designing
57000
Number of design hours
7000 hours
8.14 per designing hour
Setup
77000
Number of batches
430 batches
179.07 per batch
| Activity (a) | Cost Pool(in $) (b) | Cost Driver ( c) | Estimated cost driver (d) | Activity rate (e)= (b)/ (d) |
| Machining | 260000 | Number of machine hours | 75700 hours | 3.43 per machine hour |
| Designing | 57000 | Number of design hours | 7000 hours | 8.14 per designing hour |
| Setup | 77000 | Number of batches | 430 batches | 179.07 per batch |

