10 Using production indifference curves to determine the lea
Solution
Answer for Question 10
Production possibility curve is locus of pair of points which tells us that desired output is produced within given time frame using the allocations existing on PPC.
In our case if we use 3 programmers then 4 computers are needed to produce desired output , no other combination would do that.Similarly for same PPC 6 programmers need only 2 computers therefore {3,4} & {6,2} are the correct answers hence option B and Option C are incorrect.
Budget line which touches PPC that point is efficient point for given budget . If our budget is $1200 then budget line runs from (0,4) to (3,0) hence no point of contact.
Therefore with this budget no possibilty of desired production
Option B is correct reply to the boss.
We have following combinations such as computers have to be a whole number therefore possible combinations to check ae (3,4);(4,3);(2,6);(6,2) all will have cost is 2400,2500,2600,3000
Therefore 3 programmers and 4 computers is correct combination for lower cost and total cost is 2400
