Question 17 Matching the production rate to the order rate
. Question 17 Matching the production rate to the order rate by hiring and laying off employees as the a-none of the above b-stable workforce ,variable work hours c-lebels d-all the above e-chase Question 18 Which of the following is an approach to dealing with a bottleneck in a Theory of Constraints application? a-always use Johnson sequence rules to balance things out b-don\'t worry about to ,it will take core od it self c-none of the above d-all of the above e-keep a buffer inventory in front of it to make sure that it always has something to work or ·+Question 19 A Material Requirements Planning system is an example of which of the following scheduling systems? a-infinite loading b-all the above c-finite loading d-none of the above Question 20 Fred-erick W. Taylor is credited with which of the following? a-being the father of management consulting b-none of above c-being the father of scientific management d-all the above e-author of the principle of scientific management
Solution
17-E Chase is the Correct Option
It is also called demand matching strategy, or demand matching strategy. For an example in a restaurant when a customer orders some food then to match that demand production is done. This is an example of chase planning.
18-E
In the production unit in front pf a bottleneck a buffer inventory is kept to make sure that it has always something to work on.
19-A
Infinite loading assumes that work order capacity is infinite or unlimited. It is used in ERP system
20-C
He is called father of scientific management. He had given scientific management theory.
As per Chegg Terms I can answer maximum 4 answers at a time. I will feel glad to answer your rest questions.