Beans Corporation uses a joborder costing system with a sing

Beans Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $162,000, variable manufacturing overhead of $2.80 per direct labor-hour, and 60,000 direct labor-hours. Recently, Job K818 was completed with the following characteristics:

The estimated total manufacturing overhead is closest to:

Multiple Choice

$330,000

$162,000

$168,000

$162,003

Number of units in the job 10
Total direct labor-hours 50
Direct materials $ 920
Direct labor cost $ 1,400

Solution

Estimated total manufacturing overhead = 162000+(60000*2.8)= $330000
Beans Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predete

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site