World Company expects to operate at 90 of its productive cap

World Company expects to operate at 90% of its productive capacity of 13,000 units per month. At this planned level, the company expects to use 11,115 standard hours of direct labor. Overhead is allocated to products using a predetermined standard rate of 0.950 direct labor hours per unit. At the 90% capacity level, the total budgeted cost includes $22,230 fixed overhead cost and $111,150 variable overhead cost. In the current month, the company incurred $203,300 actual overhead and 10,875 actual labor hours while producing 17,000 units. (Do not round intermediate calculations. Round \"OH costs per DL hour\" to 2 decimal places.)

(1) Compute the predetermined standard overhead rate for total overhead.
Predetermined OH rate
Variable overhead costs
Fixed overhead costs
Total overhead costs
(2) Compute the total overhead variance.
--------Actual production 17,000 units --------
Standard DL Hours Overhead costs applied Actual results Variance Fav./Unf.
Variable overhead costs
Fixed overhead costs
Total overhead costs

Solution

Compute the total overhead variance.

Standared DL Hours computation

Output under Planned Capacity =13000*90%=11700

Total Labor hour under Planned capacity=11115

Hence Standare Labor Hr per unit=11115/117500=.950

No of units actualy produced=17000

Standared hour required =17000*.950=16150

Variable overhead costs =Variable cost/Standared Hr =111150/11115 10.00
Fixed overhead costs =Fixed overhead cost/Standared Hr =111150/11115 2.00
Total overhead costs 12.00
World Company expects to operate at 90% of its productive capacity of 13,000 units per month. At this planned level, the company expects to use 11,115 standard
World Company expects to operate at 90% of its productive capacity of 13,000 units per month. At this planned level, the company expects to use 11,115 standard