Dehner Corporation uses a joborder costing system with a sin

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor- hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per direct labor-hour 58,000 $174,000 $ 5.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job Total direct labor-hours Direct materials Direct labor cost 50 100 $690 $5,800 The total job cost for Job P951 is closest to: (Round your intermediate calculations to 2 decimal places.)

Solution

predetermined overhead rate Fixed manufacturing overhead cost (174000/58000)= 3 Variable manufacturing overhead rate 5 total predetermined overhead rate $8 per hr total job cost P951 is closest to Direct materials 690 Direct labor 5,800 overhead applied (8*100) 800 total job cost P951 7290 answer
 Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor- hours. The company based its pred

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site