not sure what the total manufacturing cost is870 is not corr
not sure what the total manufacturing cost is...870 is not correct
Solution
CALCULATION OF THE TOTAL COST OF THE JOB Cutting Finishing Total Direct Material Requisitioned $ 500 $ 310 $ 810 Direct Labour Cost $ 70 $ 150 $ 220 Add: Overheads Expenses Direct Labour Hours 97.20 324.00 $ 421 ($ 16.20 X 6 Hrs) ($ 16.20 X 20 Hrs) Machiene Hours $ 600 $ 30 $ 630 ($ 80 X 7.50 MH) ($ 4 X 7.50 MH) $ 1,267 $ 814 $ 2,081