Develop a project budget to add an addition to an existing h
Develop a project budget to add an addition to an existing home. The addition will be above the existing home and will be approximately 350 square feet of new living space which will consist of two bedrooms and a bathroom. The project duration is 4 months. The project budget must list the project costs by month. The project budget should include labor costs for different skilled labor, material costs for different categories of material, and contingency cost for risk. You must have a minimum of 15 cost items and a maximum of 30 cost items. Examples of cost items may include: People (Architect), Material (Wood), or Equipment (Crane). Total your costs by month and by cost item. Complete the assignment using Microsoft Excel.
Solution
Building Permit Fees Water and Sewer cost Excavation Foundation and steel Sheathing Tiles and Carpet Trim Material Wood Deck or Patio Landscaping and Sodding HVAC Plumbing Stairs Windows Exterior Doors Interior Doors Electrical wiring Lighting fixtures