XGmargin of safety formus hittps Help Save E hapters 19 to
Solution
Answers
Months
Hours
Cost
High Level
Nov
25
$ 7,870.00
Low Level
December
7
$ 3,550.00
Difference
18
$ 4,320.00
Difference in Cost
$ 4,320.00
Difference in units
18
Variable cost per unit
$ 240.00 [4320 / 18]
Working
High Level
Low Level
A
Total Cost
$ 7,870.00
$ 3,550.00
B
Total Units
25
7
C
Variable cost per unit
$ 240.00
$ 240.00
D = B x C
Total Variable cost
$ 6,000.00
$ 1,680.00
E = A - D
Total Fixed Cost
$ 1,870.00
$ 1,870.00
Total Cost at the high Point
$ 7,870.00
Variable cost at the high Point:
Volume at the high point
25
Variable cost per hour/unit
$ 240.00
Total Variable cost at the high point
$ 6,000.00
Total Fixed Costs
$ 1,870.00
Total cost at the low point
$ 3,550.00
Variable cost at the Low Point:
Volume at Low Point
7
Variable cost per hour/unit
$ 240.00
Total Variable cost at the low point
$ 1,680.00
Total Fixed Costs
$ 1,870.00
| Months | Hours | Cost | |
| High Level | Nov | 25 | $ 7,870.00 |
| Low Level | December | 7 | $ 3,550.00 |
| Difference | 18 | $ 4,320.00 |