What formal processes should be monitored by the Systems Engineer to ensure a fix for a noncompliance issue discovered during System Evaluation testing? (circle the best answer)
a. Initiate Corrective Action followed by an Engineering Change
b. Negotiate for a change in requirements if needed to keep the program on track
c. Assign an experienced engineer fix the problem.
Solution
Option(b) is the answer
Inorder to fix the compliant discovered during system evaluation testing, the system engineer should negotiate for a change in program on track.
This ensures that the ongoing process won\'t be interrupted..