As the production planner for Xiangling Hu Products Inc you
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 1 casting. Each housing has 1 bearing and 1 shaft. There is no inventory on hand.
Bracket Base) Spring() Clamp(a Clamp) ousngg) 10 ainl Handlle Casti ngn HandleCastin Bearing)Solution
b.
c.
c.
Case 1
Case 2
Bracket
1
For 50 Brackets
30 Base in stock
30 Base+ 20 clamp from base+ 55 from Bracket
30 Base+ 0 clamp from base+ 75 from Bracket
Base
1
50
50
20
20
20
Spring
1
50
50
50
50
50
Clamp
4
1*1+3
200
50+150
20+150
95
95
Housing
1
50
50
20
20
20
Handle
4
1*1+3*1
200
50+150
20+150
95
95
Casting
4
1*1+3*1
200
50+150
20+150
95
95
Bearing
1
50
50
20
20
20
Shaft
1
50
50
20
20
20
For c. Since both the case yield same result, consider any case for the solution
| b. | c. | c. | |||||
| Case 1 | Case 2 | ||||||
| Bracket | 1 | For 50 Brackets | 30 Base in stock | 30 Base+ 20 clamp from base+ 55 from Bracket | 30 Base+ 0 clamp from base+ 75 from Bracket | ||
| Base | 1 | 50 | 50 | 20 | 20 | 20 | |
| Spring | 1 | 50 | 50 | 50 | 50 | 50 | |
| Clamp | 4 | 1*1+3 | 200 | 50+150 | 20+150 | 95 | 95 | 
| Housing | 1 | 50 | 50 | 20 | 20 | 20 | |
| Handle | 4 | 1*1+3*1 | 200 | 50+150 | 20+150 | 95 | 95 | 
| Casting | 4 | 1*1+3*1 | 200 | 50+150 | 20+150 | 95 | 95 | 
| Bearing | 1 | 50 | 50 | 20 | 20 | 20 | |
| Shaft | 1 | 50 | 50 | 20 | 20 | 20 | 