For a sampling acceptance process with rectifying inspection
For a sampling acceptance process (with rectifying inspection) with N 2000, the following three different single sampling plans all provide equivalent protection and approximately same AOQL level of 2.0%. If the quality level (percentage of nonconforming products) is estimated to be ft 5% based on historical data, what will be the ATI for each of these 3 single plans? Which one should be selected based on the ATI?
Solution
Thus ATI plan C of n=20, c=0 is appropriate with lower risk.
| n=70 | c =2 | n=40 | c=1 | n=20 | c=0 | ||||||||
| proportion defective | np | probability from poisson distribution | proportion defective | np | probability from poisson distribution | proportion defective | np | probability from poisson distribution | |||||
| 0.01 | 1.4 | 0.833 | 0.01 | 0.4 | 0.938 | 0.0096 | 0.01 | 0.951 | = 0.049 | ||||
| 0.02 | 2.8 | 0.469 | =1-0.469 =0.531 | 0.02 | 0.8 | 0.809 | 0.0192 | =0.191 | 0.02 | ||||
| 0.03 | 4.2 | 0.21 | 0.03 | 1.2 | 0.663 | 0.0288 | 0.03 | ||||||
| 0.04 | 5.6 | 0.082 | 0.04 | 1.6 | 0.525 | 0.0384 | 0.04 | ||||||
| 0.05 | 7 | 0.03 | 0.05 | 2 | 0.406 | 0.048 | 0.05 | ||||||
| 0.06 | 8.4 | 0.06 | 2.4 | 0.308 | 0.0576 | 0.06 |