Montegut Manufacturing estimated costminimizing quantity usi
Montegut Manufacturing estimated cost-minimizing quantity using production order model to be 500 units. Production averages 100 units per day, while demand is 20 units per day. Holding costs are $3.00 per unit per year, and setup cost is $60.00. If the firm wishes to produce this item in economic batches, what is the demand for this item? How many orders should be placed per year? How many days should be between the orders (Assume 365 days per year)? What are the total costs?
Solution
EOQ = 500, H = $3, S = $60, p = 100/day, d = 20/day
The formula for EOQ is
EOQ = Sqrt (2DS/(H*(1-(d/p)))
Substituting all the above values we have
A. Demand (D) = 5000 units
Production time = Q/p = 500/100 = 5 days
Imax= (Q/p)(p - d) = (500/100)(100 - 20) = 400
B. Average number of orders per year = D/Q = 5000/500 = 10
C. Time between orders = Q/d = 500/20 = 25 days
Annual holding cost = (Imax/2) x H = (400/2) x 3 = $600
Annual setup cost = (D/Q) x S = (5000/500) x 60 = $600
D. Total cost = 600 + 600 = $1,200