Geneva Watch The Geneva Watch Corporation manufactures watch

(Geneva Watch) The Geneva Watch Corporation manufactures watches on a conveyor
belt with six stations. One worker stands at each station and performs the following tasks:
Station Tasks Processing Time (seconds)
A: Preparation 1 Heat-stake lens to bezel 1 4
I nspect bezel 26
Clean switch holes 1 0
Install set switch in bezel 1 8
Total time for A 68
B: Preparation 2 Check switch travel 23
Clean inside bezel 1 2
Install module in bezel 25
Total time for B 60
C: Battery installation Install battery clip on module 20
Heat-stake battery clip on module 1 5
Install 2 batteries in module 22
Check switch 1 3
Total time for C 70
D: Band installation Install band 45
Inspect band 1 3
Total time for D 58
E: Packaging preparation Cosmetic inspection 20
Final test 55
Total time for E 75
F: Watch packaging Place watch and cuff in display box 20
Place cover in display box base 1 4
Place owner\'s manual, box into tub 30
Total time for F 64
These six workers begin their workday at 8 :00 a.m. and work steadily until 4:00 p.m.
At 4:00, no new watch parts are introduced into station A and the conveyor belt continues
until all of the work-in-process inventory has been processed and leaves station F. Thus,
each morning the workers begin with an empty system.
a. What is the bottleneck in this process?
b. What is the capacity, in watches per hour, of the assembly line (ignore the time it takes
for the first watch to come off the line)?
c. What is the direct labor content for the processes on this conveyor belt?
d. What is the utilization of the worker in station B (ignore the time it takes for the first
watch to come off the line)?
Estimating and Reducing Labor Costs 77
e. How many minutes of idle time will the worker in station C have in one hour ( ignore
the time it takes for the first watch to come off the line)?
f. What time will it be ( within one minute) when the assembly line has processed 1 93
watches on any given day?

Solution

(Geneva Watch) The Geneva Watch Corporation manufactures watches on a conveyor belt with six stations. One worker stands at each station and performs the follow

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site