Project Details 440 Sharp solar panels Panel ratingWp 235Wpa

Project Details: 440 Sharp solar panels Panel rating(Wp)- 235W/panel Overall derating factor~85% Panel rating(W,) 235W/panel -Blacksburg average insolation per day, 4.8 kWh/m2 day | E annual n Wp . DF . (ls /1stc ) . 365 days

Solution

1. The arted MW capacity is 10.34 MW.

2. The Electricity that can be provide by the array is 15398.3820 kwh/yr

3.10 years

4. Cpacity factor=2.7%

 Project Details: 440 Sharp solar panels Panel rating(Wp)- 235W/panel Overall derating factor~85% Panel rating(W,) 235W/panel -Blacksburg average insolation per