The Arkade Company has decided to use a 15 percent allowance factor based on job time. Calculate the standard time for each work element and for the total job. The frequency equals 1 for all work elements.

(Round your answers to 3 decimal places, the tolerance is +/-0.002.)



Work Element

Mean Observed Time (minutes)

Perfomance Rating Factor

ST

Work Element

Mean Observed Time (minutes)

Perfomance Rating Factor

ST

1 1.20 0.95 \"Tell
2 1.00 0.85 \"Tell
3 0.80 1.10 \"Tell
4 0.90 1.10 \"Tell

Solution

Mean allowance = 15%

|z| for 98% = 2.33

pq/n = variance = 0.15(0.85)/1

Std dev = 0.357

Hence std time for each element and total job = [15-2.33(0,.357)15+2.33(0,.357)]

= (14.168,15.832)