From a personal or professional experience base provide an
: From a personal or professional experience base, provide an example of where the use of the linear programming models
Solution
A store has requested a manufacturer to produce pants and sports jackets.
For materials, the manufacturer has 750 m2 of cotton textile and 1,000 m2 of polyester. Every pair of pants (1 unit) needs 1 m2 of cotton and 2 m2 of polyester. Every jacket needs 1.5 m2 of cotton and 1 m2 of polyester.
The price of the pants is fixed at $50 and the jacket, $40.
What is the number of pants and jackets that the manufacturer must give to the stores so that these items obtain a maximum sale?
A company makes two products (X and Y) using two machines (A and B). Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes processing time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes processing time on machine B.
At the start of the current week there are 30 units of X and 90 units of Y in stock. Available processing time on machine A is forecast to be 40 hours and on machine B is forecast to be 35 hours.
The demand for X in the current week is forecast to be 75 units and for Y is forecast to be 95 units. Company policy is to maximise the combined sum of the units of X and the units of Y in stock at the end of the week.