Suppose each household puts out 028 m3 of waste each weck Pa
Solution
per week waste generation = 0.28 m3 / week
operation 5 days per week
compaction ratio is 4.2
if the volume of the truck is V then
no of family N Per week = V*5*4.2 /0.28
For Large truck N= 28*5*4.2/.28=2100
For small truck N= 14*5*4.2/.28=1050
b)
each day they are serving
Large truck = 2100/5 = 420 families
small truck = 1050/5 = 210 families
time for large truck 420*30/60+150 = 360 min = 6 hr
time for small truck 210*30/60+195= 300 min = 5 hr
c)
total no of working days in year = 52*5 = 260 days ( 5 days/week)
cost of crew for large truck = 48*260*6 = $74880
cost of crew for small truck = 48*260*5 = $62400
total annual cost for large truck = $125000 +$74880 =$199880
total annual cost for small truck = $72000 +$62400=$134400
annual cost per households for large truck = $199880/2100 = $95.181
annual cost per households for small truck = $134400/1050 =$128
d)
clearly we can see large truck is of minimum cost