You are pouring the concrete foundation for your new office
Solution
13)
Foundation
length = 27 feet
Width = 18 feet
Height = h feet (assumed as foundation height is not given)
Volume of the foundation = 27*18*h = 486h Cubic Feet
Thickness of concrete = 8 inches = 8/12 = 2/3 feet
Volume of concrete length wise = (27*2/3)h + (27*2/3)h = 36h
For calculating widthwise volume we need to deduct 2*2/3 = 4/3ft from width
The effective width = 18 - 4/3 = 50/3
The volume of concrete widthwise = ((50/3)*(2/3))h + ((50/3)*(2/3))h = (200/3)h
Total concrete volume = (200/9)h + 36h
= h((200/9) + 36) = (524/9)h cubic feet
1 yard = 3feet
1 cubic yard = 3*3*3 = 27 cubic feet
or
1 cubic feet = 1/27 cubic yard
Concrete volume in Cubic Yards = (524/9)h*(1/27) = 524h/243 = 2.16h cubic yards
cost of 1 cubic yard = $70
Cost of 2.16h cubic yards = 2.16h*70 = $151.2h
So the cost varies with the height of foundation