How to decide on the number of concrete samples to be tested

How to decide on the number of concrete samples to be tested for each mix?


How to decide on the number of concrete samples to be tested for each mix?



Solution

solution-

The number of concrete samples to be tested for each mix are decided on the basis of volume of concrete work.

For quantity of work between 0-5m3 , one sample is required for testing, for quantity of concrete work between 6-15m3 , two samples are required.Similarly work between 16-30 m3 , three samples are required. For 31-50m3 , four samples are required for testing and if the quantity of concrete work is above 50 m3 , four plus one additional samples are required for each 50 m3 or part thereof.

 How to decide on the number of concrete samples to be tested for each mix? How to decide on the number of concrete samples to be tested for each mix? Solutions