OPERATIONS TIME Schedule the above six jobs through two mach

OPERATIONS TIME

Schedule the above six jobs through two machines in sequence to minimize the flow time using Johnson\'s rule:

The following table contains information regarding jobs and their operation time in two machines.

Solution

Johnson’s Rule is:

OPERATIONS TIME

JOB

MACHINE1

MACHINE2

A

7

4

B

15

15

C

5

9

D

10

12

E

16

2

F

18

8

Hence, the optimum sequence of jobs using Johnson\'s rule is C --> D --> B --> F --> A --> E

OPERATIONS TIME

JOB

MACHINE1

MACHINE2

A

7

4

B

15

15

C

5

9

D

10

12

E

16

2

F

18

8

OPERATIONS TIME Schedule the above six jobs through two machines in sequence to minimize the flow time using Johnson\'s rule: The following table contains infor
OPERATIONS TIME Schedule the above six jobs through two machines in sequence to minimize the flow time using Johnson\'s rule: The following table contains infor

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site