please answer the following competitive quetions Q1 addmitu
please answer the following competitive quetions :
 
 Q-(1) addmitures are added to concrete to
 1) increase strength
 2)reduce heat of hydration
 3)delay setting time of cement
 4)reduce water cement ratio
 wich of the above statement are correct
 a. 1 only
 b. 1 and 2
 c. 2 and 3
 d. 3 and 4
 ______________________
 Q(2) a pile driven to clay soil, capacity of pile does not depends upon ?
 1- cohesion of soil
 2- pile diameter
 3- soil pile adhesion coefficient
 4- depth of ground water
 ___________________________
 Q(3) construction team means
 a. architect
 b. engineer
 c. contractor
 d. all of the above
 ____________________________
 Q(4) consider the following statements
 a. Strength of concrete cube in inversely proportional to water cement ratio
 b.a rich concrete mix higher strength than lean concrete mix since is has more cement content
 c. shrinkage cracks on concrete surface are due to exces water in mix
 which of the following statement is/are correct ?
 a. 1,2 and 3
 b. 1 and 2 only
 c. 2 only
 d. 2 and 3 only
 _________________________________________________
 Q(5) metal fatigure can be defined ads
 select one
 a.failure due to repeated of stress higher than the altimate tensile stress
 b. failure due to repeated cyclic stress below the endurance limit
 c. failure due to repeated cyclic stress after necking has just been observed
 d. failure due to repeated cyclic stress, even below yeild stress
 _________________________________________________________________
  Q(6) work break down structure relative to project wich of the following statements are false :
 a. break up the projects top down
 b. break down the draft down top
 c. used to handle large project
 ____________________________________________________________________________
  Q(7) what is the reaction in celling fan
 a. tension
 b. compression
 c. torsion
 d. shear
 c. bending moment
 _____________________________________________________
 Q(8)project control works starts :
 a. at the beginning of project
 b. throughout the entire process
 c. during construction
 ___________________________________
 Q(9) ratio of maximum water demand to average water demand is
 a. design flow factor
 b. critical flow factor
 c. peack factor
 ______________________________________________________________________
  Q(10)which of the following estimate would occur last in project time line
 A. rough order of magnitude
 B. bid estimate
 c. square foor etimate
 d. assemblies estimate
 __________________________________________________________________
  Q11 . both architect and engineer make use of the cost estimate of the project
 select one :
 a .for sight selection
 b. for designing of the project
 c. for choosing alternative
 d. all answer are true
 __________________________________________________________________
  Q12 a bridge footing is constructed in sand , the water tabe is at the ground surface the ultimate bearing capacity unit weight :
 a. buoyant unit weight
 b. dry unit weight
 c. saturated unit weight
 d. total unit weight
 _____________________________________________________________________________________
  Q13. the primary use of fast track schedualling is to :
 a. decrease cost of constuction
 b. decrease the cost of professional services
 c. to avoid future cost increases to garantee project cost before start construction
 ___________________________________________________________________
 
Solution
Ans 1) Option d) 3 and 4
Ans 2) Option d) Depth of Ground Water
Ans 3) Option d) All of the above
Ans 4) Option d) 2 and 3 only
Ans 5) Option c) failure due to repeated cyclic stress after necking has just been observed
Ans 6) Option a) break up the projects top down
Ans 7) Option a) break up the projects top down
Ans 8) Option c) torsion
Ans 9) Option c) peack factor
Ans 10) Option d) assemblies estimate
Ans 11) Option d) all answer are true
Ans 12) Option a) buoyant unit weight
Ans 13) Option b) decrease the cost of professional services