10. Superpave Hot Mixed Asphalt should be layed at 3 times the thickness of the 11. Two types of asphalt plants used in New Jersey are drum mix and batch mix solute minimum lay down temperature for asphalt (bituminous) concrete T F nominal maximum aggregate size T F plants. T F 12. The ab is 125 T F 13. Compaction of hot mix asphalt on a soft yielding subgrad e will not affect density and/or air voids t is not necessary to coordinate the paver speed and truck deliveries uniformly, during paving operations. T F 14. I T F he recommended spreading temperature of bituminous concrete depends on the base temperature and thickness of the mat. 15. T Generally, the minimum rolling time is 4 minutes for thin bituminous concrete mats to 15 minutes for thick mats 2-4\" in depth. T F 16. T F 17. Petroleum solvents should be used to clean tools, paving machine hopper and screeds, rollers and hand tools. T F 18. A nuclear gauge is used to measure asphalt concrete density in place. 19. The minimum base temperature required to apply a lift thickness of 1\" or less 20. Cracking of a surface layer over time is generally caused by hardening of 21. Improved subsurface drainage and maintenance is not significant as to TF is 50°F T F asphalt, low temperatures and lack of asphalt in the matrix. pavement longevity temperatures, high asphalt content in the mix, type of aggregate used in the T F T F 22. Pave ment rutting can be related to excessive tire load and repetitions, high mix and improper compaction. rock of the same thickness and asphalt content. repair all deteriorated areas and improve the subdrainage. stick to the roller and blue smoke will emit from the loaded dump truck. 23. River gravel is often used in bituminou s concrete and is just as good as trap 24. The first steps in overlaying a deficient pavement with moderate defects is to T F 25. If the asphalt concrete mix is too hot during the paving operation the mat will T F 26. Prior to the start of construction, the inspector\'s first job is to review the plans T F T F contract documents and the traffic control plan.

Solution

10. (False) all mix selections should allow for at least 4 times the nominal maximum aggregate size for the desired lift thickness.

11. (True)

12.(False) asphalt must be placed and compacted before they cool to 185 degree F.

13.(True)

14.(False)

13.

 10. Superpave Hot Mixed Asphalt should be layed at 3 times the thickness of the 11. Two types of asphalt plants used in New Jersey are drum mix and batch mix s

Get Help Now

Submit a Take Down Notice

Tutor
Tutor: Dr Jack
Most rated tutor on our site